Craig's RV-14A Build
Home
(7530.25 Total Hrs)
Avionics
(22 Hrs)
Fwf
(43 Hrs)
Inventory
(4.5 Hrs)
Other
(19.5 Hrs)
Section 14
(10.5 Hrs)
Section 18
(30.5 Hrs)
Section 19
(37.5 Hrs)
Section 20
(3 Hrs)
Section 36
(2 Hrs)
Section 38
(55.25 Hrs)
Section 39
(51 Hrs)
Section 40
(43.5 Hrs)
Section 42
(6.5 Hrs)
Section 43
(52 Hrs)
Section 44
(6.5 Hrs)
Section 45
(71.5 Hrs)
Section 46
(26 Hrs)
Section 47
(15 Hrs)
Section 48
(7.5 Hrs)
Section 49
(15.5 Hrs)
Section 50
(10.5 Hrs)
Section 51
(1.5 Hrs)
Section 54
(4 Hrs)
Section 59
(1 Hrs)
Section 60
(4 Hrs)
Section 62
(15.5 Hrs)
Section 9
(13 Hrs)
Wings
(7 Hrs)
Install CO detector. Run wires for glare shield lights, defrost fans, and canopy open switches. Help move engine and ready for installation.
18 Mar 2024
3 hours
Avionics
#March-2024
#wes-March-2024
Share
Installed canopy seals and pins. Started prepping interior parts
18 Mar 2024
4.5 hours
Section 39
#March-2024
#bryan-March-2024
Share
Final sand and prime layup. Installed seals. Prepped for other seals.
12 Mar 2024
3 hours
Section 39
#March-2024
#bryan-March-2024
Share
Applied body filler and sanded layup. Installed rear seal. Cut seals. Prepped surfaces for seal installation.
11 Mar 2024
4.5 hours
Section 39
#March-2024
#bryan-March-2024
Share
Sanded canopy
8 Mar 2024
4 hours
Section 39
#March-2024
#bryan-March-2024
Share
Canopy fiberglass lay up
4 Mar 2024
4.5 hours
Section 39
#March-2024
#bryan-March-2024
Share
Ran pitot sense wire ton left wing.
4 Mar 2024
1 hours
Avionics
#March-2024
#wes-March-2024
Share
Sanded filler, cut fiberglass layup pieces
26 Feb 2024
3.5 hours
Section 39
#February-2024
#bryan-February-2024
Share
Installed canopy clips. Applied tinted micro to lower canopy edge.
23 Feb 2024
2 hours
Section 38
#February-2024
#jared-February-2024
Share
Riveted canopy rails. Fabricated and installed wear strips. Tightened hardware and put canopy on plane.
19 Feb 2024
5 hours
Section 39
#February-2024
#bryan-February-2024
Share