Craig's RV-14A Build
Home
(579.25 Total Hrs)
Avionics
(22 Hrs)
Fwf
(43 Hrs)
Inventory
(4.5 Hrs)
Other
(19.5 Hrs)
Section 14
(10.5 Hrs)
Section 18
(30.5 Hrs)
Section 19
(37.5 Hrs)
Section 20
(3 Hrs)
Section 36
(2 Hrs)
Section 38
(55.25 Hrs)
Section 39
(51 Hrs)
Section 40
(43.5 Hrs)
Section 42
(6.5 Hrs)
Section 43
(52 Hrs)
Section 44
(6.5 Hrs)
Section 45
(71.5 Hrs)
Section 46
(26 Hrs)
Section 47
(15 Hrs)
Section 48
(7.5 Hrs)
Section 49
(15.5 Hrs)
Section 50
(10.5 Hrs)
Section 51
(1.5 Hrs)
Section 54
(4 Hrs)
Section 59
(1 Hrs)
Section 60
(4 Hrs)
Section 62
(15.5 Hrs)
Section 9
(13 Hrs)
Wings
(7 Hrs)
Sanded filler, cut fiberglass layup pieces
26 Feb 2024
3.5 hours
Section 39
#February-2024
#bryan-February-2024
Share
Installed canopy clips. Applied tinted micro to lower canopy edge.
23 Feb 2024
2 hours
Section 38
#February-2024
#jared-February-2024
Share
Riveted canopy rails. Fabricated and installed wear strips. Tightened hardware and put canopy on plane.
19 Feb 2024
5 hours
Section 39
#February-2024
#bryan-February-2024
Share
Fabricate and install brake lines onto gear legs. Run engine instrument wires from existing harness.
12 Feb 2024
4.5 hours
Section 40
#February-2024
#wes-February-2024
Share
Finish and install ANL fuse. Finish and install manifold pressure, oil pressure, and fuel pressure manifold. Start brake lines
9 Feb 2024
5 hours
Section 40
#February-2024
#wes-February-2024
Share
Installed master relay and starter relay. Wired both and tested.
5 Feb 2024
5 hours
Section 43
#February-2024
#wes-February-2024
Share
Scuffed, countersunk, installed hardware on canopy. Installed defrost fans
5 Feb 2024
4.5 hours
Section 39
#February-2024
#bryan-February-2024
Share
Installed battery and ground strap. Gathered all parts for firewall electrics.
2 Feb 2024
1.5 hours
Section 51
#February-2024
#wes-February-2024
Share
Painted canopy frame, marked and taped canopy
2 Feb 2024
3.5 hours
Section 39
#February-2024
#bryan-February-2024
Share
� 2023